Two Twin cylinder steam turbines
Year: 2003 to 2005
137 MW, 13800 volt, 50Hz
Boiler: 420ton/hr, 13.7MPa,
output temp 540deg C
inlet temp: 247.93deg C
eff: 91.79%
Complete plant with coal and ash handling system, water system,
chemical system, electrical and control system.
Total 270 MW
Two Twin cylinder steam turbines model: N137.5-13.24/535/535,
Manufacture: Harbin Steam Turbine Factory, Year: 2003 to 2005
Boiler Model: HG-420/13.7YM1, Manufacture: Harbin Boiler Factory,
Year 1998 and 1999
420ton/hr, 13.7MPa, output temp 540deg C, inlet temp: 247.93deg C,
eff: 91.79%
Generator Model: QFS-137-2, 137 MW, 13800 volt, 50Hz, Year 1998
and 1999